VTFG Installation Tips
Tips and suggestions are basic advice only and should not replace guidance from qualified jobsite professionals. Please carefully read and understand the following page prior to your installation- Installation and Warranty.
- Important Note: Misuse or improper installation may result in product failure, voided warranties, and additional costs.
- Follow the blueprints or engineering plans for each specific jobsite without deviation.
- Seek guidance for your job from qualified professionals who oversee your specific jobsite.
- Assemble frames, grates, solid covers, or bolted units with proper steel reinforcement before pouring concrete.
- Double-check all measurements and secure forms to prevent shifting during concrete pouring.
- Allow concrete to fully cure before disassembling forms.
- Spanish Assistance: Si hablas español, simplemente pide un intérprete en nuestro personal.
Contact Bass & Hays or call us today Toll Free 1-800-258-2278 -or- 972-263-1360 DFW Metro to check stock, request drawings or submittals, BABA, AIS or LEED certifications, or place orders.





